GILL COLISEUM MENS B-BALL LOCKER ROOM RENOVATION

The Work Contract consists of Men’s Basketball Locker room Interior demolition and renovation. Furnish labor, material, equipment and engineering of temporary shoring required for the partial demolition and removal of existing structure, and other material as detailed on the Demolition Drawings. The Contractor shall be responsible for engineering and execution of all temporary shoring and obtaining any special permits that may be required by the governing jurisdiction.

Status

Bidding Closed

Prebid Date5/25/17 3:00 pm

Bid Date6/7/17 2:00 pm

Company & Contacts

Oregon State University - Kelly

Kelly Oar   737-4672

Location

Gill Coliseum on the Oregon State University Campus, Corvallis, Oregon.

THIS OPPORTUNITY IS ONLY AVAILABLE TO CONTRACTORS WITH A CURRENT OREGON STATE UNIVERSITY (OSU) RETAINER CONTRACT FOR CONSTRUCTION RELATED SERVICES.

**************UPDATED***********
Mandatory pre-bid walk through:
THURSDAY MAY 25, 2017 3:00PM
Gill Coliseum basement room 5
660 SW 26th Street
Corvallis, OR 97333

Bid Close date:
Wednesday June 7, 2017 2:00PM

AT:
Construction Contract Administration
Property Services Building
644 SW 13th Street
Corvallis OR 97333
The Bids will not be publicly opened.